danielmarti 
                             
Shooting range 
Project: January 2010 - in progress
Promoter: private
Collaborators: Abdon Marrahí, arq.
                        Alberto Fernández, arq. técnico
Structure: Cyme ingeniería
Installations: Juan Alberto Revert
Views: Fernando Such
Builded surface: 8.900'00 m2
Intervention area: 200.000'00 m2

Published at:
www.arquitecturabeta.com
Shooting range
                                                                                                 
                                                                                                    
 

                                                                                                    portada
 
                                                                                                    lateral

                                                                                                    corredisses

                                                                                                    lateral2

                                                                                                    corredissesbn

                                                                                                   

                                                                                                    fotomuntatge
                                       
                                                                                                   

                                                                                                   

                                                                                                   

                                                                                                   

                                                                                                    

                                                                                                    
                                                                                                    
                                                                                                    

                                                                                                    
                                                                                                   

                                                                                                   
                                                                                                   
                                                                                                    The proposed program for this shooting range is amed to get facilities that  
                                                                                                    provides maximum quality of service and possibilities for the user in the
                                                                                                    activities offered and in architectural and spatial quality with the intention
                                                                                                    that this building becomes an international reference.

                                                                                                    This type of architectural program consumes lots of soil due to the large size
                                                                                                    of the rooms needed and from the beginning there was a risk of creating a
                                                                                                    building not integrated into the environment because its massive
                                                                                                    configuration.  

                                                                                                    We try to get a correct integration of the building into its environment by
                                                                                                    taking three important decisions that will determine the genesis of the project:

                                                                                                            - To fluff up the building, so trees and vegetation can grow between the
                                                                                                            built volumes.
                                                                                                            - The semiburied construction of the bulding allows us to link it to the land
                                                                                                            and reduce the impact of it's presence.
                                                                                                            - The choice of local materials, wood and stone elements.